    1. ICSS for PakArab Fertilizer Ltd – Ammonia Plant (In Progress)
      Engineering, Installation and Commissioning of complete ICSS for Ammonia Plant using Yokogawa Centum VP R 6.08 and Prosafe RS 4.06.
    2. ESD System for PakArab Fertilizer Ltd – Urea Plant (In Progress)
      Replacement of HIMA ESD system by Yokogawa Prosafe- RS with single and dual redundant module configurations, having safety integrity level (SIL3).
    3. ICSS Upgrade for Fatima Fertilizer Ltd – CAN & NP Plants
      Engineering, Installation and Commissioning of Yokogawa CENTUM CS-3000 to CENTUM VP R 5.01 Up-gradation project.
    4. 4. ICSS Upgrade for Fatima Fertilizer Ltd – Ammonia & Urea PlantsEngineering, Installation and Commissioning of Yokogawa CENTUM VP R 4.05 to CENTUM VP R 6.08 Up-gradation project.
    5. Control System Upgrade for PakArab Fertilizer Ltd – Nitric Acid PlantEngineering, Installation and Commissioning of Yokogawa VP CS3000 to CENTUM VP R6.08 Up-gradation project.
    6. PakArab Fertilizer Ltd – Ammonia PlantDesigning, Engineering, Installation and Commissioning of pneumatic controller to electrical controller.